Main Street

Third Avenue to Washington Street

This project calls for the improvements of approximately 2,300 lineal feet of Main Street, from Third Avenue to Washington Street. Work will include installation of 300 lineal feet of sanitary sewer line; 2,200 lineal feet of storm drain line; and 1,300 lineal feet of water main; installing underground electrical conversion appurtenances; removal of existing pavement, curbs and sidewalks; grading; installing an illumination system; placing gravel base and crushed surfacing; hot mix asphalt paving; installing curbs, gutters, and sidewalks; landscaping. The Call for Bids was issued on July 21, 2010. The project is funded in part by Surface Transportation Program (STP) and Transportation Improvement Board (TIB) funds that will be supplemented from a number of other sources to finance design and construction. For more information, please contact the Public Works Department at (360) 384-4006.

The Estimated Cost Range for this project was $1.94 to $2.37 million.

See our Facebook Photo Gallery for this project.

Documents: