Gateway Main Street South Stormwater Project

This project is for installation of approximately 470 feet of 36” diameter corrugated poly storm pipe and new storm structures within an easement located between Main Street and LaBounty Drive at 1788 LaBounty Drive.  Work will include removal and/or abandonment of an existing 18” concrete storm line and structures within the new pipe alignment.

Bid Process